Please note: In order to keep Hive up to date and provide users with the best features, we are no longer able to fully support Internet Explorer. The site is still available to you, however some sections of the site may appear broken. We would encourage you to move to a more modern browser like Firefox, Edge or Chrome in order to experience the site fully.

Optimizing the Operation of a Multiple Reservoir System in the Eastern Nile Basin Considering Water and Sediment Fluxes, PDF eBook

Optimizing the Operation of a Multiple Reservoir System in the Eastern Nile Basin Considering Water and Sediment Fluxes PDF

Part of the IHE Delft PhD Thesis Series series

PDF

Please note: eBooks can only be purchased with a UK issued credit card and all our eBooks (ePub and PDF) are DRM protected.

Description

The Eastern Nile riparian countries Egypt, Ethiopia and Sudan are currently developing several reservoir projects to contribute to the needs for energy and food production in the region.

The Nile Basin, particularly the Eastern Nile Sub-basin, is considered one of a few international river systems with potential conflicts between riparian countries.

In the absence of formal mechanisms for collaboration, the transboundary nature of this basin makes sound water resources development challenging.

The large seasonal and inter-annual variability of the river flow exacerbates those challenges.

A further complication is the high sediment load in the Eastern Nile rivers during the high flow season. This study contributes to fill relevant knowledge gaps through a better understanding of the methods needed for a complex system of multipurpose reservoirs, considering both water quantity and sediment load.

The study quantifies the impacts of water resources development in the Eastern Nile basin and identifies system management options at both regional and country level.

Developing a collaborative and unified perspective of the countries towards new projects can be beneficial for all.

New operation rules are proposed for improving operation of the current system when new infrastructures are developed and operated either unilaterally or, ideally, cooperatively.

Information

Other Formats

Information